Owner: Town of High River
Engineer: BSEI Municipal Consulting Engineers
-Replace 5 blocks of water and sewer mains along 7th Street
-Install 450mm raw water main to bring water from wells to the water treatment plant
-Replace residential services up to property line
-replace sidewalks and curb
– Supply and place new road base and asphalt
– Dress boulevard with topsoil and finish with sod