Owner: Town of High River
Engineer: BSEI Municipal Consulting Engineers
-Full road and utility replacement on 4 streets in 60 days
-13 spot repairs in Southwest of High River
– Supply residents with temporary water lines
-Remove and dispose of existing water and sewer mains
-Install new water and sewer mains and residential services
-Repair sidewalks and curb sections
-Supply and place new road base and asphalt
-Installation of inflatable pipe liner in and existing sewer main